Wybrane publikacje |
1 | Artykuł 2023
Efekt uczenia w harmonogramowaniu wieloobiektowych przedsięwzięć budowlanych z zastosowaniem algorytmu symulowanego wyżarzania = The learning effect in scheduling multi-object construction projects using the simulated annealing algorithm. Przegląd Budowlany. 2023, nr 1/2, s. 103-107. ISSN: 0033-2038 | Zasoby:DOIURL | |
|
2 | Artykuł 2022
The impact of the learning and forgetting effect on the cost of a multi-unit construction project with the use of the simulated annealing algorithm. Applied Sciences. 2022, vol. 12, nr 24, art. 12667, s. 1-20. ISSN: 2076-3417 | Zasoby:DOISFX | |
|
3 | Artykuł 2022
Effective allocation of manpower in the production of precast concrete elements with the use of metaheuristics. Journal of Civil Engineering and Management. 2022, vol. 28, nr 4, s. 247-260. ISSN: 1392-3730; 1822-3605 | Zasoby:DOISFX | |
|
4 | Artykuł 2021
Profit optimization for multi‑mode repetitive construction project with cash flows using metaheuristics. Archives of Civil and Mechanical Engineering. 2021, vol. 21, art. 67, s. 1-17. ISSN: 1644-9665; 2083-3318 | Zasoby:DOIURLSFX | |
|
5 | Artykuł 2019
Cost optimization of multiunit construction projects using linear programming and metaheuristic-based simulated annealing algorithm. Journal of Civil Engineering and Management. 2019, vol. 25, nr 8, s. 848-857. ISSN: 1392-3730; 1822-3605 | Zasoby:DOIURLSFX | |
|
6 | Referat konferencyjny 2019
Scheduling the production of precast concrete elements using the simulated annealing metaheuristic algorithm. W: 3rd World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium (WMCAUS 2018), 18-22 June 2018, Prague, Czech Republic. [Bristol] : IOP Publishing, 2019. art. 112083, s. 1-8. | Zasoby:DOIURLSFX | |
|
7 | Referat konferencyjny 2018
Bicriteria problem of discrete optimization in planning a multiunit construction project. W: 3rd Scientific Conference Environmental Challenges in Civil Engineering (ECCE 2018) : Opole, Poland, April 23-25, 2018 / eds. D. Beben, A. Rak and Z. Perkowski. [Les Ulis : EDP Sciences], 2018. art. 04008, s. 1-8. | Zasoby:DOIURLSFX | |
|
8 | Artykuł 2017
Management of resources in multiunit construction projects with the use of a tabu search algorithm. Journal of Civil Engineering and Management. 2017, vol. 23, nr 2, s. 263-272. ISSN: 1392-3730 | Zasoby:DOISFX | |
|
9 | Artykuł 2016
Wybrane problemy remontowe żelbetowych zbiorników na ciecze oraz niecek basenowych = Selected problems of repairs of reinforced concrete reservoirs for liquids and swimming pools. Materiały Budowlane. 2016, nr 6, s. 130-131. ISSN: 0137-2971 | Zasoby:DOI | |
|
10 | Artykuł 2016
Teoria szeregowania zadań a metody sprzężeń czasowych = Job scheduling theory and Time Couplings Methods. Materiały Budowlane. 2016, nr 6, s. 20-21. ISSN: 0137-2971 | Zasoby:DOI | |
|